Size | 7400 x 4400 x 3100 (4500) |
Capacity | 24 euro pallets (14 400 kg) / process |
Range | -20°C (-18°C) … +2°C
Product in E2-boxes or trolleys. If the products are in boxes, thawing spacers must be inserted between the layers. Optimal thawing process is achieved when the product’s start temperature is -20°C (-18°C) for both the scheduled process and the so called direct thawing process. |
Defrosting time | Varies by product/by packaging, indicative times:
-20°C … -2°C 10-12 h -20°C … +2°C 16-24 h |
Cooling | Cooling by means of a cooling agent. A coolant available in the system of the plant, such as NH3, glycol, Freezium or similar. The solution is pumped to the heat exchanger delivered by Kometos. The machinery contains 2 cooling blocks. Cooling capacity requirement: 25 kW. Max. temperature of the solution: -15°C |
Delivery limit | The client shall supply and connect a pipeline from their own cooling system to the valves delivered by Kometos. Kometos shall deliver the required valves, heat exchangers, pumps and pipelines from the heat exchanger to the room. |
Heating | Heating by means of a heating agent. A heated solution available in the systems of the plant, such as glycol, Freezium or similar. Heating capacity need: 90 kW. Minimum temperature of the solution: +40°C. |
Delivery limit | The client shall supply and connect a pipeline from their own cooling system to the valves delivered by Kometos. The client shall provide for a possible supplementary filling of the system, if required. |
Air circulation | Air circulation with EC- fans |
Intermediate level/
Air guide |
Electromechanical spindle motors for lifting and lowering the intermediate level. |
PLC control | Control PLC KOMETOS. The operating panel is located outside the room next to the door.
Thawing equipment can be connected to the client’d Ethernet data network through which Kometos has the opportunity for a secure service connection. |
Electrical connection | 400 V 63/A/ room |
Water connection | R½”, 4 bar |
Compressed air supply | R½”, 2,8 bar |
Drain connection |